WebThe BOQ will be provided to assist with the pricing. However, the BOQ submitted with the tender is required to be completed on the original copy uploaded on eTenders by hand and not typed-out. A copy of the BOQ will be available in excel on the 22/03/2024. Refer to the National Treasury eTender WebIncluding Excavation . 37 Construction of brick manhole internal size of 2'-0" x 2'-0" x 2'-0" to 3'-0" hight, consisting of 4" thick Grade 15 concrete base and 9" thick brick walls in 1:3 cement and sand 1/2" thick cement and sand rendering 1:2 to internal and external surfaces of walls finished smooth with neat cement with with 3" thick Grade ...
BOQ for construction of Yudhiri Bailey Bridge
WebDPM to beam and block floor construction >500mm 61.81 wide horizontal Visqueen EcoMembrane polythene DPM black 1200 gauge (300mu) BBA 2.5.4.1.1 m² 96 30 2.5.5 Excavation support 2.5.5.1 Excavation support 2.5.6 Retaining excavated material 2.5.6.1 Excavated material retention Retain excavated subsoil on site in spoil heaps 50m 3.96 WebWe are converting an old hotel into a 21 bed HMO and have full planning approved. Now we need Building control drawings. Bill Of Quantities. Lots of help satisfying conditions such as method Statements and surveys for like for like timber repairs on wooden windows. Happy to split parts of this job off to different suppliers so if you can do part of it that's fine. please adhere to the following
BILL OF QUANTITIES CONSTRUCTION OF THE BRIDGE OVER …
Webtrees from site (including excavation of roots and backfilling and compaction of hole in layers of 150mm to 95% mod. ASSHTO ) No 2.0 2.0 2.0 2.1.7 Fell and Remove >250mm up to 600mm diameter bluegum trees from site (including excavation of roots and backfilling and compaction of hole in layers of 150mm to 95% mod. ASSHTO ) No 2.0 2.0 2.0 WebThe BoQ is presented to the tenderers to allow them for easily set up a price for executing the works. With BoQ, the tenderers can easily figure out construction costs for their tender. The contractor submit their tenders against the bill … Webi Soil Excavation for raft slab (Actual volume to be determine on site) 165 M3 ii To Compact Well on Existing Subsoil (1 Ton Compact Roller) 445.5 M2 iii One layer of 150mm well compacted hardcore 445.5 M2 iv One Layer of 50mm thk Lean Concrete G15 445.5 M2 v One Layer of 1.2mm thick Water Proof Membrane Sheet (including edge Slab) 475.5 M2 please adhere to this